Insulation that got rained on through a torn jacket, crushed flat by a ladder against the rack, soaked in leaked oil, or pulled off for a repair and never put back — we strip it out, inspect the pipe underneath, and rebuild the run to current practice. Across Arlington and the Dallas–Fort Worth Metroplex, on piping, tanks and equipment.

This is not cosmetic work. Wet insulation is worse than no insulation at all: its R-value is gone and it holds water against the steel. Leaving it on costs fuel every hour and quietly eats the pipe. New insulation prices the same as a fresh install — most jacketed pipe runs land between roughly $18 and $70 per linear foot — so the question is only when, not whether.

01

Why wet insulation is worse than none

Dry insulation works because it traps still air. Fill those pores with water and the R-value collapses — a soaked section insulates little better than bare pipe, so the fuel loss comes back while the jacket still looks fine from the walkway. Crushed insulation is the same problem in slow motion.

On a hot line it gets sneakier: the pipe flashes the water near the steel, so the run feels dry at the surface and passes a casual check while the outer layers stay wet and hold water against the metal. On cold and chilled lines there is no flash-off at all — the water just sits on the steel and corrodes it. That is corrosion under insulation, and it is how a pipe fails with no visible warning. Cold lines with a broken vapor barrier are the worst case.

02

The walk-down finds it

The free survey is where damaged insulation shows itself. The IR gun reads hot stripes on runs that should be uniform — a soaked section shows warmer than its dry neighbors on a hot line, colder and sweating on a chilled one. The jacket tells the rest: rust stains bleeding from the laps, white mineral streaks, a bulge where wet fiber slumped to the bottom of the pipe.

We walk the system end to end, flag every section that is wet, crushed, oil-soaked or missing, and put the whole scope in a written estimate within 24 hours — which sections come off, what we expect to find, and what the rebuild costs. You see the list before anything is touched.

03

Asbestos: where we stop

We remove non-asbestos materials only — fiberglass, mineral wool and modern calcium silicate. If a system is old enough that the lagging could contain asbestos, we stop. It gets sampled, and if it tests positive it is handled by a licensed asbestos abatement contractor before we touch anything on that run. No exceptions.

That is not us passing the buck — it is the law and it is your lungs. What we can do is coordinate around it: survey the whole system, mark what is suspect, and come in behind the abatement contractor to rebuild the runs clean. You get one plan instead of two contractors pointing at each other.

04

Strip, inspect, rebuild

Old material comes off in sections, gets bagged at the pipe and leaves the site — it does not sit in a pile in your mechanical room. Then the part that matters: the bare pipe gets inspected before anything new goes on. You get photos of the bare steel, surface rust gets wire-brushed, and deep pitting or wall loss gets flagged to you before we cover it, because insulating over a compromised pipe just schedules the next removal.

The rebuild follows current practice, not whatever was there before: thickness specced to the temperature — 1.5 inches to 200°F, 2 inches to 350°F, 3 inches to 600°F — sealed staggered joints, and a vapor barrier on cold service. Materials and pricing are on the pipe insulation page; the numbers are the same whether the pipe was bare or badly dressed.

05

Storm and flood damage

North Texas hail opens more jacket laps than forklifts do. A hailstorm that dents the metal jacketing on an outdoor rack lets the next rain straight into the insulation, and by the time the stains show the fiber has been wet for weeks. After a storm, a one-hour walk-down with the IR gun tells you whether you caught it in time to re-jacket, or whether sections have to come out.

Flooded mechanical rooms are the clearest call of all: any insulation that stood in water comes off, because it will not dry inside a jacket and on chilled lines it will never dry at all. We strip to the flood line, inspect and rebuild — one crew, our own people, with the covers and jacket fabricated on our own benches. Small scopes carry the $1,500 job minimum; most re-insulation prices like new work, $18–70 per linear foot jacketed.

— What we offer

IR gun finds the wet sections

Soaked insulation reads hot on a hot line and sweats on a cold one. The free walk-down maps every bad section before work starts.

Non-asbestos scope, stated plainly

Fiberglass, mineral wool and modern calsil only. Suspect old lagging stops the job until it is sampled and cleared or abated by a licensed contractor.

Old material bagged and gone

Stripped insulation is bagged at the pipe and leaves the site for disposal. No pile in your mechanical room.

Photos of the bare pipe

Every run is inspected and photographed before new insulation goes on. You see the steel you are paying to cover.

Rebuilt to current spec

Thickness matched to temperature, joints staggered and sealed, vapor barrier on cold service — not a copy of what failed.

Our own crew, our own benches

No subs. Sections cut, covers sewn and jacket rolled in-house, so the rebuild fits the first time.

Related work from CJM

Tell us what you need and we’ll walk through the options with you. (214) 603-9142

Common questions

Is wet insulation really worse than bare pipe?
Yes. Its R-value is gone, so you lose the fuel anyway — and unlike bare pipe, it holds the water against the steel, which drives corrosion under insulation. On cold lines with a broken vapor barrier the problem compounds, because the line keeps pulling moisture in.Full answer
What if the old insulation turns out to be asbestos?
We stop. We only remove non-asbestos materials — suspect lagging gets sampled, and anything positive is handled by a licensed asbestos abatement contractor before we come back to rebuild. We will tell you on the walk-down if a system looks old enough to need testing.
What does removal and re-insulation cost?
The rebuild prices like new work — most jacketed pipe runs land between roughly $18 and $70 per linear foot installed — plus the strip-out and disposal, which the written estimate breaks out separately. Small scopes carry a $1,500 job minimum.Full answer
Does re-insulating pay back like new insulation does?
Faster, in a sense — a soaked run is already losing close to bare-pipe numbers, about $75 per foot per year on a 4-inch line at 350°F running 24/7, so the rebuild starts saving the day the jacket closes. Hot-line paybacks typically land under a year.Full answer

Get a free walk-down on the damaged runs

Stained jacket, crushed sections, a system that got rained on or flooded — we will map exactly what has to come off and what it costs to rebuild. Call (214) 603-9142.

What helps us prepare your quote
  • Identify the pipe, tank, equipment or other system and share dimensions or photos when available.
  • Include operating temperatures, indoor or outdoor exposure, existing insulation and the required jacket or finish.
  • Tell us about access and shutdown windows. We review the application before recommending materials and a scope of work.

— Start your project

Tell us what needs wrapping.

A short form, a walk-down, and a written estimate within 24 hours. No pressure, no obligation.

or call(214) 603-9142Se habla español

Text us a photo and we can usually quote from it.

Add project details (optional)

Up to 3 photos. We resize phone photos automatically. You can also add them after sending.

We respond within 24 hours. No measurements required.